Industrial outdoor scene with machinery, a small building, and a tree, under clear blue sky.
Cables installed and run from main control room to power the pumps
Bagging area complete
Progress at smelter
fencing complete
fencing complete
Progress at smelter
Construction workers laying a new concrete sidewalk around a tree, with pipes running along the wall and mountain scenery in the background.
Two large rectangular piles of wet soil or compost on white sheets outside, with construction and gardening tools nearby.
100 Metric Tons from Tivani to Mini-plant
Two men inspecting a large industrial gear and mechanical machinery at night, with a tall blue metal structure in the background and tools on the ground.
Construction workers pouring and leveling concrete for a small brick wall and pathway outside a beige brick building.
100 Metric Tons from Tivani to Mini-plant
Ore processing plant (this handles 1-2k ROM per month, pilot plant. The bigger plant will be 30k ROM per month (30x more productive)
Outdoor playground slide structure with two spiral slides and two red barrels at the top, surrounded by trees with yellow and green leaves, a brick building in the background, and two men talking at the base of the structure.